家具製造流程

Furniture & Bathroom Arrangement Services

From initial consultation to on-site completion, we follow a systematic process to ensure every step is executed with precision, making furniture installation and space arrangement smoother, more efficient, and fully reliable.

報價

STEP 01 Quotation

Provide the required materials, floor plan dimensions, height specifications, and project location.

下單

STEP 02 Order Placement

After confirming the quotation, sign and return the quote, and pay a 30% deposit to schedule production.

放樣

STEP 03 On-site Measurement

Our staff will visit the site to measure and confirm the actual dimensions and details. If purchasing individual furniture pieces only, on-site measurement is not required.

加工

STEP 04 Manufacturing

Depending on the materials and items involved, the production period takes approximately 30 to 45 days.

施工

STEP 05Installation

The finished products are delivered to the designated location and installed on-site by our skilled craftsmen.

完工

STEP 06 Completion

Upon completion, photos of the finished work are provided, an invoice is issued for payment, and a one-year warranty is included.